McDonald Municipal and Industrial at Work
Electrical Projects
City of Ft. Worth Holly Water Treatment Plant
MMI assisted the City of Fort Worth with the construction of their new Holly Water Treatment Plant. This included the installation of three 2,750 kW 2.4kV Generators and the construction of a 2,300 sqft building to house newly installed switchgear. This project was completed four months ahead of schedule.
Harris County Municipal Utility District Plant 344
Harris County, as part of its continuing service to its residents, contracted with MMI for the installation of a new 500kW generator. To support the installation a new ATS, overhead and underground electrical, and associated switchgear were installed.
Ft. Bend Municipal Utility District Plant 133
MMI assists Ft. Bend with the rehab of MUD 133. This project included the installation of a 500kW diesel generator. In addition, MMI tied the new generator into an existing ATS and installed new panels capable of supporting the new generator and the future installation of additional generators.
TBD
TBD
Pipes, Valves, and Fittings Projects
Prestonwood Water Plant Booster Pump Replacement
To aid Prestonwood Utility District with its water plant modernization efforts, MMI installed new booster pumps. The project included the installation of new control panels, tying the new pumps into the existing power system, and the erection of a canopy cover to protect the newly installed equipment from harsh weather conditions.